The executed projects:
1-
Commercial complex
in AL-Madaen :
It is constructed on four areas of land
vicinal to each other, built with one floor , consists of 35
commercial shop near kissra arch . part of the complex had
been sold to the Private Economic Bank .
2-
housing complex in
karadah-zoweyah (5houses):
5 Houses, each house 195m2 consist of two
floors with special street for them. The complex had been
sold to Babel for Cinematic Production and is occupied by
them .
3- commercial building in Irkhaitah:
Commercial building consist of two
floors, the ground floor has got seven commercial shops and
the first floor has got four commercial flats. And it had
been sold to one of the Iraqi investors .
4- two commercial building in Battaween:
They are consist of two floors, the
ground floor has 16 commercial shop and the first floor 6
commercial flats. And it had been sold to one of the Iraqi
investors .
5- commercial building in AL-Qasir EL-Abaydh
area :
Commercial building with three floors ,
the ground floor has (13) shops located on two streets , AL-Needhal
and the backside streets , the first and the second floor
has (6) living flats . And it had been sold to Al-Mosul Bank
and occupied by them .
6- commercial building in Nafik AL-Shurttha
area :
Commercial building – three floors
(ground , first and second floor) , the ground floor has
(10) shops located on the main street with (4) flats , their
main gate is from the backside street and each floor has (7)
living flats and the total flats are (18) flat. The
apartments had been sold to the citizens separately .
7- living building in Irkhaitah :
living building in (30 floors ( ground ,
1st and 2nd ) , the ground floor
consists of (7) apartments and a shelter ,the 1st
and 2nd floor , each one has (8) apartments and
the total are 23 apartment and a room for the guard and
located on two streets . The building was sold to Iraqi
Stock Exchange Market and occupied as the Headquarter for
Iraqi Stock Exchange .
8- Commercial
building five floors in AL-Karadah near the company location
:
commercial building : five floors(ground
and four floors with underground shelter . each floor
consists of (3) apartments and a room for the guard .
And she is remaining property to company and she is shown to
sale or rent .
future projects:
1-
AL-ghazaleyah
project – on apiece of land 5400 sq.m
2-AL-Bataween
project- on apiece of land 963m2
.
3- AL-Bataween project- on apiece
of land 1036m2 .
4- AL-Karrada Dakhel
project- on apiece
of land 1255m2 .
AL-Mamoura company for real
investments
Housing complex project in Ghazaleyah
– Baghdad
The site- the project located in AL-Ghazaleyah
sector Baghdad governorate / AL-Karkh province along the way
that joins the two cities AL-Amerah and shulah about 10km
from Mansour.
Specialties of the site
The total area to the project site is
about (54) thousand sq.m surrounded the site from the north
–east and the south – west unoccupied land now, it is
possible to be used as a living or housing according to the
foundation design of Baghdad city and the high tension power
line passing through from the north side (60m) for bidden
and also from the north – west side main way (60m) for
bidden .
The philosophy of the project design
The edreesi center for engineering
consultative , which belong to the ministry of housing and
construction made first study to the complex and they
decided the first plans and architectural and finding
feeding sites to the project location with the services nets
sources of the infra construction water, sewages, power and
road nets….e.t.c . the general shape for the housing complex
was decided within the located area and the balance to the
needs of people who are living and their investments
requirements and the growing of the living areas neighboring
.
Agreements
Agreement has been done by Baghdad
Municipality Dated on the May/11/2005 to construct project
according to the new conditions and criterions and the most
important ones are :
1-
the height of the
buildings shouldn’t be less than five floors .
2-
the public
services should be started first before the execution of the
project and going together in parallel line .
3-
the open areas
shouldn’t be less than 50% from the total area .
4-
recording all the
name of Baghdad Municipality freely .
and this will require to re-design the
project according to these requirements and that will lead
to increase the number of the housing units and canceling
the idea of constructing living houses and review
distributing the housing buildings and also to review the
designs of the roads nets and the technical of the infra
construction to meet with the studies of the general housing
plans in Iraq .
the company had communicated the
specialized departments and had assigned one of the
consulting bureaus for setting up the primary designs in
order to obtain the formal approvals concerning them in
order facilitate the completion of the detailed designs and
the economic feasibility and actually, the completion of all
designs of the project had been done and including the
services . And as the company is now with the point of
finding the necessary funding in order to execute the
project and put the necessary basis which ensures the
requirements of the residential investing .
AL-Ghazaleyah project
For housing complex
AL-Mamoura company for real estate was
established in 1994 with initial capital 75.000.000 Iraqi
dinar and during the previous years the company had carried
out many commercial and housing projects and according to
the available abilities . the capital had been increased for
many times and become 6180.000.000 ID.
The company has got many areas and one of
them is the area # 10/10 district 19 junaina & Ghazaleyah
with an area 54 hectare , which is located within the
housing buildings area including Baghdad fundamental design
and the company has called many engineering bureaus in order
to put the design to build a houses buildings in the
mentioned area . the agreement had been done with one of the
bureaus and according to the required conditions that have
been put by Baghdad municipality . the most important thing
is that each building consists of five floors in addition to
the services buildings like the schools , kindergarten ,
clinic , police station and a mosque ….e.t.c. In this
housing project there would be the services of roads ,
sewages , electrical , and sanitary foundations and all the
needed things in this project . the bureau , which is
charged continuing to put this design and according to the
finished ;
1- Thirty four buildings with five
floors for each building and in each floor 4 flats and each
flat has 3 bed-rooms and another services .
2- Fourteen building with five floors
and each floor has got 4 flats with 2 bed-rooms .
3- Building the mentioned services
above .
4- The measurement for each flat that
consists 3 bed-rooms is 180 sqm within the walls .
5- The measurement of the 2 bed-rooms
is 150 sqm within the walls .
6- The total area for the building
with five floors is 172600 sqm
The total assessed cost to the project ;180000000000 ID and the total assessed
cost to the services buildings is 20000000000 ID so as the
assessed cost for the project about 200 Billion ID which is
equal to 16500000 million $ . we hope to execute the project after having finished the detailed designs
and the required approval the financing.
We would like you to consider this brief
sufficient to give simple idea about the project in
AL-Ghazaleyah .
Best regards
|